Construction Supervision

Supervision plan, inspections at key stages and a signed certificate of compliance, for your projects as well as the ones we designed.

Construction Supervision

Supervision plan, inspections at key stages and a certificate of compliance with the Construction Code, signed by an engineer. We act as the supervising professional under Bill 76 for your projects, and we supervise the structural work we have designed.

Contractors, owner-builders, developers, condominium syndicates and architects: a team available on site in Montreal, on the South Shore, on the North Shore and across Quebec, clear visit reports, and a signed certificate to submit to the Régie du bâtiment, the City, the insurer or the lender.

  • Bill 76 (2024)Mandatory supervision by a professional, once the regulation comes into force, for the buildings it will cover
  • 3 to 5 stagesAt least three inspections under the law, five under the draft regulation (three for certain single-family houses)
  • Certificate of complianceA signed document certifying that the inspected work complies with the Construction Code

I

Six types of construction supervision assignments

Construction supervision means checking at the right moment, before the work is covered up, that what is being built matches the plans and the Code. These are the six types of assignment we carry out for contractors, owner-builders and project owners.

Supervision plan

Before the first shovel hits the ground: identifying the key stages (foundations, structure, envelope, concealed elements), the checks to perform at each, the documents to produce and the schedule. The plan becomes the shared roadmap for the contractor and the supervisor.

  • Key stages
  • Schedule
  • Documents

Inspections at key stages

Visits scheduled before the work is concealed: footings and foundation walls before backfilling, reinforcing steel before the pour, framing before close-in, structural elements before finishing. Findings photographed, non-conformities flagged on site, and a visit report within the agreed time.

  • Foundations
  • Framing
  • Visit report

Certificate of compliance (Bill 76)

At the end of the work, the signed certificate confirming that the inspected work complies with the Construction Code, which the project owner will have to obtain and keep under the Régie du bâtiment du Québec regulation. One simple rule: we only certify what we have seen.

  • Construction Code
  • RBQ
  • Signed by the engineer

Supervision of structural work

For projects we designed or whose plans we review: checking reinforcing steel, anchors, beams, columns and connections, answering site questions, issuing change directives and a final certificate of compliance with the sealed plans.

  • Reinforcing steel
  • Connections
  • Directives

Owner-builder projects

An owner who builds or renovates on their own has the same obligations as a contractor. We support them from the permit to the certificate: supervision plan, advice before each stage, inspection visits and a final report for the City, the insurer and the lender.

  • Owner-builders
  • Support
  • Certificate

Final inspection and deficiency follow-up

Final inspection visit, deficiency list, verification of corrections and a final notice of compliance for the owner, the condominium syndicate, the insurer or the lender. A complete, organized close-out file remains useful to everyone involved.

  • Acceptance
  • Deficiencies
  • Final notice

II

What Bill 76 changes for your projects

An Act mainly to improve the quality of construction and public safety (Bill 76), assented to on November 27, 2024, creates an obligation to have construction work supervised by a professional for certain categories of buildings. This obligation is not yet in force: it will take effect on a date set by the government, under the terms of a regulation of the Régie du bâtiment du Québec.

Supervision follows the project at the stages that will later be concealed: we check before pouring, closing in or backfilling.

In practice, the project owner (contractor or owner-builder) will have to enter into a contract, before work begins, with an engineer, an architect, a professional technologist or a person recognized by the Régie. This professional draws up the supervision plan, inspects the work at no fewer than three key stages and issues, at the end of the work, a certificate of compliance with the Construction Code.

The draft regulation published on May 13, 2026 first targets residential buildings that are not covered by the Regulation respecting the guarantee plan for new residential buildings. It provides for inspections at no fewer than five key stages, or three for certain single-family houses. As of October 2026, the Régie is still reviewing the comments, and the final text may change. The law provides for fines for non-compliance and allows the Régie to order work to be suspended.

  • Supervision plan: drawn up before the work begins, it sets the key stages, the checks to perform and the documents to produce.
  • Inspections: at least three under the law, five under the draft regulation, carried out by the retained professional before the work is concealed.
  • Certificate of compliance: issued by the professional at the end of the work; to be kept and sent to the Régie when the regulation requires it.
  • Timeline: no coming-into-force date has been set yet. A project starting now can already plan supervision along these lines, which makes the transition easier.

We follow publications from the Régie du bâtiment and the Ordre des ingénieurs, and we update this page as the regulatory steps unfold.

III

The situations that call for supervision

A legal obligation, a third-party requirement or simple prudence: four situations come up often in our supervision assignments.

  • Plan

    You're starting a project that Bill 76 will cover

    A rental building, a plex, a residential building outside the guarantee plan: once the regulation comes into force, you will need a supervision plan, inspections at the key stages and a certificate. We build the visits into your construction schedule to limit their effect on the progress of the work.

  • Protect

    You're building or renovating yourself

    An owner-builder carries the same responsibilities as a contractor, without day-to-day site experience. A supervisor who comes by before each critical stage helps avoid costly rework and provides the documents the City, the insurer and the lender will ask for.

  • Finance

    The lender, the insurer or the City requires professional follow-up

    Progress draws tied to progress reports, a builder's risk insurance policy, a permit condition: our visit reports and notices of compliance with the plans meet these requirements, with dated photos and precise findings.

  • Correct

    A project going off track

    A foundation poured without inspection, missing reinforcing steel, a beam modified on site, a contractor who no longer answers: we observe, we document, we issue correction directives and we verify that they are carried out before issuing any certificate at all.

IV

Our approach, from the plan to the certificate

Effective supervision is decided before the project starts: when the stages are agreed in advance, nobody waits for the supervisor and nothing is covered up without being seen.

  1. Plan review and supervision planReview of the architectural and structural plans, the permit and the applicable Code requirements. Drafting the supervision plan: key stages, checks, documents expected from the contractor (data sheets, concrete certificates, compaction reports), schedule.
  2. Kick-off meetingWith the contractor and, where applicable, the architect: who notifies whom, when, and with how much notice, in practice 48 business hours before each stage. We agree on what must never be covered up without inspection.
  3. Inspection visitsAt each key stage: verification against the plans and the Code, dated photographs, measurements, findings. The visit report is sent within the time agreed in the supervision plan; a non-conformity is flagged on site, before the work moves on.
  4. Non-conformities and correctionsA written directive, a proposed correction or a request for a solution from the contractor, then a follow-up visit to verify. When the correction requires a calculation, the engineer does it; when it requires the architect, we coordinate.
  5. Certificate and final fileA signed certificate of compliance for the inspected work, a notice of compliance with the plans for the structural portion, and an organized close-out file: supervision plan, visit reports, photos, directives, certificates.

V

What you receive

Documents that are useful on site, at the Régie, at the bank and with the insurer, and that remain useful years later.

Supervision · Construction site

  • A written supervision plan, with the agreed key stages, checks and schedule.
  • A report for each visit, within the agreed time: findings, dated photographs, conformities and non-conformities.
  • Clear directives and notices of non-conformity, with the expected correction and the planned return visit.
  • The certificate of compliance, signed, for the inspected work, and the notice of compliance with the plans for the structure.
  • A complete close-out file, ready for the Régie du bâtiment, the insurer, the lender or the buyer.
Engineer, member of the OIQSigned
certificate

Reference framework

Mandatory supervision
Bill 76 (2024), in force on a date to be set
Certificates of compliance
RBQ regulation (draft, May 2026)
Technical requirements
Construction Code, Chapter I, Building
Contractor licensing and obligations
Building Act (CQLR, c. B-1.1)
Supervision by an engineer
Engineers Act, ss. 2 and 3
Builders' liability
C.C.Q., arts. 2118 to 2121
Professional practice
OIQ guidelines

The supervision obligation under Bill 76 is not yet in force. We confirm the requirements that apply to your project before proposing a supervision plan.

VI

Service area

We supervise residential, condominium and commercial projects in Montreal, Laval, the South Shore and the North Shore.

  • MontrealIsland of Montreal
  • LavalÎle Jésus
  • South ShoreLongueuil, Brossard, Boucherville, Saint-Lambert, La Prairie, Châteauguay
  • North ShoreTerrebonne, Repentigny, Blainville, Boisbriand, Saint-Eustache, Mirabel
  • West IslandPointe-Claire, Kirkland, Dollard-Des Ormeaux

Is your project elsewhere in Quebec? Write to us and we will tell you whether we can take on the assignment.

VII

FAQ

Who should retain the supervisor: the contractor or the owner?

Bill 76 places the obligation on the project owner, meaning the contractor or the owner-builder, depending on the project. In practice, we contract with one or the other. In every case, the supervisor keeps their professional independence: they certify what they have observed, not what they are asked to certify.

What are the key stages?

The law provides for at least three inspections; the May 2026 draft regulation proposes five, or three for certain single-family houses. For a residential building, the typical stages are the foundations before backfilling (footings, walls, drain, waterproofing), the structure before it is closed in (framing, beams, anchors, bracing) and the building envelope or concealed elements before finishing. The supervision plan sets the stages for your project.

How much notice does the supervisor need?

We ask for 48 business hours' notice before each stage, and we plan the visits with the contractor at the kick-off meeting. For a concrete pour or a stage that can't wait, we try to be there the same day when the schedule has been shared in advance.

What happens if a non-conformity is found?

It is flagged on site and confirmed in writing in the visit report, along with the expected correction. The contractor corrects it, we check again, and the certificate is issued only once the correction has been verified. The goal isn't to hold up the project, but to keep a defect from being covered up and discovered ten years later.

Does the certificate of compliance cover the whole building?

It covers the work inspected under the supervision plan, measured against the requirements of the Construction Code. Anything covered up without inspection cannot be certified. That is exactly why the plan and the advance notice matter so much. The certificate also doesn't replace the certificates from other trades (electrical, plumbing, gas).

Does this replace the municipal inspection or the guarantee plan?

No. The municipal inspections tied to the permit, the guarantee plan for new residential buildings and the supervision provided for by Bill 76 are three separate regimes that apply on top of one another. The May 2026 draft regulation specifically targets residential buildings that are not covered by the guarantee plan.

How much does construction supervision cost?

We offer a flat fee per stage or an overall flat fee for the project, set according to the number of key stages, the size of the building and the distance. The written service proposal specifies what is included (plan, visits, reports, certificate) and the rate for any additional visit if a return visit is needed.

Is supervision of the work by a professional mandatory today?

Not yet as a general rule. Bill 76, assented to on November 27, 2024, provides for mandatory supervision, but the section that imposes it is not yet in force. The draft regulation published on May 13, 2026 is still under review.

In the meantime, supervision may already be required by the municipality, the lender, the insurer or the drawings themselves. We will tell you what applies to your project.

Further reading

Articles by our team to explore the topic in more depth.

Construction supervision by an engineer

Supervision plan, site visits at key stages and certificate of compliance: the engineer's role during the work.

Read the article →

Strengthening an existing structure

Added load, change of use, new opening or damage: when to strengthen and which solutions to consider.

Read the article →

Home addition on piles or a foundation

Screw piles or a concrete foundation: the deciding criteria, the joint with the existing house and what the permit requires.

Read the article →

Enlarging a basement window

Basement bedroom, foundation wall to cut: what the code requires, the lintel, the window well and the engineer's role.

Read the article →

The provisions cited are those applicable in Quebec when this page was last updated. The supervision obligation under Bill 76 is not yet in force; the exact requirements will depend on the building category and the final regulation. Page updated on .

Next step

A project to supervise, a certificate to obtain?

Send us the plans and the scheduled date for the foundations: we'll propose a supervision plan and a written service proposal.