Structure, Foundations and Additions
Structural engineers in Montreal. Sealed drawings for your permit, addition, load-bearing wall or foundation, based on what the building can actually carry.
or call (438) 993-8518
Other services
Structure, Foundations and Additions
We design and strengthen building structures across the Montreal area: sealed plans for your permits, additions and extra storeys, load-bearing wall openings, foundation stabilization, retaining walls. We start by understanding the building, on site when the project involves an existing structure, before proposing a solution.
Our practice is built around Montreal's building stock: brick plexes, apartment buildings, foundations on clay, post-war fill. Before we sign off on work to an existing building, we go and see it.
- On siteA site visit before any calculation on an existing building
- Written timelineTimeline for the plans stated in the service proposal, based on scope
- OIQPlans signed and sealed by a licensed engineer
I
Six areas of structural and foundation work
Designing means starting from an intention and making it buildable. Working on an existing building means starting from a structure that already stands and establishing what it can still carry. We do both, and they are two different crafts.
Structural plans for new buildings
Houses, cottages, plexes, small apartment buildings and commercial buildings. The work runs from the structural grid to the connection details, with a load table that makes the plans verifiable.
- Framing
- Foundations
- Sealed plans
Additions and extra storeys
The question isn't how to draw the new volume. It's proving that the existing building can carry it. We follow the chain down to the footings, and we check them with test pits when the original plans are missing.
- Existing capacity
- Support reinforcement
Load-bearing wall openings and removal
Removing a wall, widening an opening, opening up a floor plan. The beam is the easy part. The real work is following the load down to the footing, where two bearing points replace an entire wall.
- Load path
- Permits
Foundation stabilization and piles
When a support has lost its bearing capacity, piles transfer the load to a stable soil layer. That still has to be demonstrated: the diagnosis always comes before the quote.
See foundation inspection →- Helical piles
- Underpinning
- Supervision
Retaining walls
Holding back a slope, a sloped parking area or a neighbouring excavation. Soil pressure is calculated, drainage behind the wall is designed, and you never get one without the other.
- Earth pressure
- Drainage
Strengthening an existing structure
A sagging beam, notched joists, a new load or a change of use. We reinforce what can be reinforced rather than replacing everything: steel plates, sistering, added columns, new bearings. Before reinforcing, we check what the existing structure can carry.
See the load capacity assessment →- Beams and joists
- Steel plates
- Bearing repairs
II
When the law requires a structural engineer
As a general rule, as soon as a load-bearing element is modified, added or removed, the municipality asks for plans signed and sealed by an engineer before it issues the permit. An experienced contractor can often install a beam correctly, but only an engineer can sign and seal the required plans.
The more a project affects the structure, the broader the assignment: from a simple opening to new construction, the drawings cover more elements and require more checks.
- Opening in a wall
- Removing a load-bearing wall
- Addition
- New construction
Targeted assignmentFull assignment
The following work usually calls for engineering plans in the Montreal area.
- Removing or cutting into a load-bearing wall, widening an existing opening, combining two rooms.
- Adding a storey or building an addition that bears on the existing structure.
- Designing a new structure, residential or commercial, including its foundations.
- Reworking a foundation: piles, underpinning, footing enlargement, structural repair.
- Adding a significant load: a hot tub on a deck, mechanical equipment on the roof, an attic conversion.
- Repairing damage after a flood, a fire or ground movement.
The principle behind it all
Every load needs a continuous path to the ground: from the roof to the floors, from the floors to the beam, from the beam to the columns, from the columns to the footings. Changing one link means checking every link that follows. That is why removing a wall is never just a matter of choosing a beam: the load that was spread along the full length of the wall is now concentrated at two points, and the footing under those points has to be able to carry it.
III
Steel, engineered wood or concrete: how we decide
The choice of material is rarely about looks. It comes down to the span, the depth available in the ceiling, site access and supply lead time.
| Material | Where it wins | Its limits |
|---|---|---|
| Steel | Long spans with a shallow beam depth, concentrated loads, heavy load transfers. | Fabrication lead time, demanding handling, corrosion protection. |
| Engineered wood | Everyday residential work, built-up beams that can be carried in through a stairway, quick availability. | Sensitive to moisture, with shorter spans for the same beam depth. |
| Concrete | Foundations, widened footings, slabs, underpinning. | Curing time, and a heavy dead load that has to be carried all the way down to the ground. |
In Montreal renovations, access often decides. A steel beam that is ideal on paper is useless if it won't fit through the basement door or if no crane can set up in the back lane. It's the first question we ask, before we size anything.
What stretches a schedule
Rarely the calculations. It's waiting for information: a land survey, a soil report, a client decision on the finished ceiling height, or missing original plans that force us to open up and see what is really carrying the load.
IV
Our approach, from the first call to the seal
The sequence doesn't change, whether the project is a ten-foot opening or an entire building. What changes is how deep each step goes.
- Scoping by phoneType of project, age of the building, existing plans, constraints from the architect or the contractor. This call tells us whether a visit is needed and what to prepare beforehand.
- Site visitMeasuring actual dimensions, locating load-bearing elements, noting joist direction and the condition of supports. Where needed, we open up to see what the finishes hide.
- Analysis and calculationsA complete load path analysis, checks on existing supports and footings, sizing of new members. This is where we determine what is possible, and at what technical cost.
- Producing the documentsFraming and foundation plans, general notes, connection details, a table of design loads. The document is signed and sealed, and it is made to be built from, not just filed.
- Follow-up during constructionWe stay reachable for the contractor's questions and come to the site at the key stages. A plan with no one to answer for it is likely to be interpreted.
V
What you receive, and how long it takes
A project is judged by what stays in your files once the work is done. Here is what we deliver, and the timelines to expect when your file is complete.
Structural drawings · Permit
- A set of signed and sealed plans from an engineer who is a member of the Ordre des ingénieurs du Québec, suitable for your permit application.
- The table of design loads, which lets a third party check the design rather than take it on trust.
- Connection details at critical locations, so the contractor has nothing to improvise on site.
- An assessment report when the project involves an existing building: located and measured observations, causes, severity, and corrective measures precise enough for contractors to price.
- A certificate of compliance at the end of the work when we provide the supervision. It's a document the next buyer may ask you for.
signed
and sealed
Timelines to expect
- Site visit
- length confirmed when the visit is booked
- Structural plans, depending on scope
- stated in the service proposal
- Assessment report after the visit
- stated in the service proposal
- Crack movement monitoring
- several months
Movement monitoring has to cover at least one full freeze-thaw cycle. No single visit can establish that a crack is stable.
VI
Service area
We prepare structural drawings for houses, plexes, condominiums and commercial buildings in Montreal, Laval, the South Shore and the North Shore.
- MontrealIsland of Montreal
- LavalÎle Jésus
- South ShoreLongueuil, Brossard, Boucherville, Saint-Lambert, La Prairie, Châteauguay
- North ShoreTerrebonne, Repentigny, Blainville, Boisbriand, Saint-Eustache, Mirabel
- West IslandPointe-Claire, Kirkland, Dollard-Des Ormeaux
Is your building elsewhere in Quebec? Write to us and we will tell you whether we can take on the assignment.
VII
FAQ
Which areas do you serve?
We work in Montreal, Laval, Longueuil and the South Shore, the North Shore, and elsewhere in Quebec depending on the assignment. Sensitive clays, post-war fill and shallow foundations are not spread randomly across the map, and knowing where they are changes how we approach a diagnosis.
How much does a structural project cost?
It depends on three things, and none of them can be guessed in a thirty-second phone call: the scope of the project, the state of the existing documentation and the level of verification the building requires. An opening in a documented load-bearing wall doesn't take the same work as a foundation assessment on a century-old plex with no plans.
We scope the project during a first call, then send you a written proposal that details what is included and what isn't. You know what you are committing to before the work begins.
Do you work directly with my contractor or my architect?
Yes, that's common. With an architect, the ideal is to come on board while the geometry can still be adjusted: a column grid shifted a few feet at the right time simplifies the whole structure. With a contractor, we stay reachable during construction for technical questions, which avoids decisions made in a rush.
What should I prepare before your visit?
Three things, and they save real time. The original plans if they exist, even partial, even old. Invoices or reports from previous work, which often explain what we observe. And an idea of when the thing that worries you first appeared, because that information often guides the diagnosis.
For access, we need to be able to walk around the building and reach the basement or crawl space.
Do you also provide construction supervision?
Yes, and it's often the first step people cut to save money. It's also the one that lets you demonstrate, years later, that the work was carried out as the plans intended. Supervision covers the key stages: the supports, the reinforcing steel before the pour, the loading of a beam, a pile reaching refusal.
Do I need a soil study for my project?
Not always, but often as soon as significant loads are added or the new foundation sits at a different depth from the existing one. In the region's clay areas, designing a foundation without knowing the soil's bearing capacity means working from an optimistic assumption. We tell you at the scoping stage whether your project needs one, and we coordinate the laboratory's work when it does.
Do I need a permit to remove a load-bearing wall in Montreal?
Yes. In Montreal, work that affects the structure requires a permit from the borough. The application must include signed and sealed engineering drawings showing the new beam, its supports and the load path down to the foundations.
Requirements vary from one borough to another. We check those of your borough before we start drawing.
Further reading
Articles by our team to explore the topic in more depth.
Removing a load-bearing wall in Montreal
How to recognize a load-bearing wall, what the engineer calculates before drawing the beam, and the City permit.
Read the article →Foundation stabilization with piles
Helical piles, driven piles or underpinning: when stabilization is justified, and why the diagnosis comes first.
Read the article →Foundation cracks: when to worry
The cracks that call for action, the ones that do not, and how to tell them apart.
Read the article →Strengthening an existing structure
Added load, change of use, new opening or damage: when to reinforce and which solutions to consider.
Read the article →Home addition on piles or a foundation
Screw piles or a concrete foundation: the deciding criteria, the joint with the existing house and what the permit requires.
Read the article →Enlarging a basement window
Basement bedroom, foundation wall to cut: what the code requires, the lintel, the window well and the engineer's role.
Read the article →The timelines on this page apply to a complete file. Permit requirements vary from one borough to another, and we check the ones that apply to your address before producing the documents. Page updated on .
Next step
Let's talk about your project
Describe the situation in a few sentences: the type of building, what you want to do or what you're seeing, and the deadline you're working against. We'll tell you frankly whether it calls for a visit, and what to plan for.